1) SCOPE OF THE PLANS
The Operating Plans (annual and monthly) are published according to Delibera 137/02, published by the Autorità per l’energia elettrica ed il gas. Other references for the Annual Operating Plans are the Chapters 8 and 14 of the Network Code and, for Monthly Operating Plans, Chapter 14, paragraph 4, of the Network Code.
The Operating Plans take account of the actual and planned increases of transportation capacity, as indicated in the 10- and 15- years capacity plans. The management of the various interventions is carried on according to the procedures indicated in the Network Code, for the cases which involve a reduction of transportation capacities; furthermore. The Plans take into account existing coordination with interconnected networks.
Therefore, to use properly the plans, it is necessary to consider that:
Therefore, the plans give an indication of the elements that can affect the availability of the full transportation capacity during the following two Thermal Years; the evaluation is carried on more precisely for the first year, because the interventions of the first year can affect the second year.
Anyway Snam Rete Gas makes all the information available on a merely indicative and non-binding basis, holding the right to update them in every moment, and in case of unforeseeable events.
2) CONTENTS OF THE PLANS AND WARNINGS
The efficient management of the transportation system requires the comprehensive monitoring and control of all its components; to meet this objective, Snam Rete Gas network is subject to periodic inspection, control and maintenance programmes in order to prevent possible anomalies and malfunctioning. This also ensures that the gas transportation infrastructure is maintained at the highest level of security and efficiency. Such maintenance does not generally impact on the transportation capacity.
In addition to inspections, controls and maintenance, also other interventions, planned by Snam Rete Gas, which give rise to interruptions/reductions in transportation capacity, shall be taken into consideration.
As a general rule, Snam Rete Gas determines in the first instance whether it is feasible or not to utilise alternative network assets for the transportation service. If this is not possible, Snam Rete Gas will make any effort to minimise the impact of the maintenance interventions on the gas flows on its network.
The Operation Plans contain, expressed as variations of transportation capacity, the elements necessary to estimate the level of reliability of the gas transportation system. Generally, the structure of the transportation system does not involve particular situations, except those of force majeure, that are out of the scope of the Operation Plans.
The planning of the interventions, connected to reduction of transportation capacity, take into account of several feasibility conditions, included weather conditions.
Finally, it is important to remember that Operating Plans do not give any information about the availability of gas, but only about the possibility to transport gas quantity that the Shippers introduce at the entry points and withdraw at the redelivery points.
3) FURTHER POINTS OF REFERENCE FOR THE OPERATING PLANS
3.1. Type of service provided (firm transportation, interruptible transportation)
3.2. National Gas Pipeline Network Points taken into account
The Operating Plans are referred to specific entry and exit points of the National Gas Pipeline Network, where transportation capacities are defined;
3.2.1 Entry points interconnected with foreign networks (imports)
- TARVISIO (import from Russia)
- GORIZIA (import from Slovenia)
- PASSO GRIES (import from North Europe)
- MAZARA (import from North Africa)
- GELA (import from Libya)
For such entry points, the transportation capacity taken into consideration for the period of analysis is the sum of firm transportation capacity and of the interruptible capacity (if available).
3.2.2 Entry points from LNG terminals
- PANIGAGLIA
- MINERBIO (CAVARZERE)
For such entry points, it is indicated the transportation capacity for the period in consideration.
3.2.3 Entry points from national production
For the entry points interconnected with national productions, it is indicated the transportation capacity published by Snam Rete Gas (on a daily basis), the related monthly transportation capacity and the related transportation reductions, referred to the previous values.
3.2.4 Entry points interconnected with storages
For such entry points, which are virtual (gathered in ‘hubs’), Snam Rete Gas operates the transportation of the planned inlet and outlet quantities in compliance with the storage operator. In the Operating Plans, only the eventual transportation reductions are specified.
3.2.5 Exit point interconnected with foreign networks (exports)
- TARVISIO
- GORIZIA
- PASSO GRIES
- BIZZARONE
- SAN MARINO
For such export points, it is indicated the transportation capacity for the period in consideration.